2025 portfolio · Kitchen, bath, tile & finishes · Handyman Thornton, CO

Recent work, in Thornton.

A working gallery of completed kitchen, bath, tile, flooring, and finish projects from the last year — drawn from across the Thornton / Westminster / Broomfield / Northglenn / Arvada service area. Each tile pairs a before-and-after with the scope, the city, and a link straight into the matching service page so you can read the offer behind the finished work.

The gallery

Eight projects. Same crew, same standards.

Every photo pair sits next to its scope and city tag, and each tile links into the matching service hub or detail page — read the offer before the photo, not after.

Thornton
Bathroom shower wall under construction with waterproofing membrane, backer board, tile spacers, and a tub surround.
Before
Completed bathroom with a white tub, blue-gray wall tile, and matching floor tile.
After

Thornton kitchen reface + quartz

Cabinet reface, soft-close doors, quartz counters. Two draw-floors, live-through.

180-sq-ft galley · reface + quartz · 8 weeks

See Thornton kitchen reface + quartz
Westminster
Room with an exposed stud partition and protected flooring during a remodel.
Before
Completed room with black-and-white checkerboard tile flooring and white trim.
After

Westminster kitchen, full replace

Full cabinet replacement, layout reworked, appliance package upgraded.

230-sq-ft L-shape · full replace + appliances · 11 weeks

See Westminster kitchen
Broomfield
Unfinished bathroom alcove with blue-painted shower walls, a bare floor, and construction tools.
Before
Completed compact bathroom with a tiled shower, wood vanity, white vessel sink, and round mirror.
After

Broomfield bath, tub-to-shower

Tub-to-shower conversion, Schluter waterproofing, niche cut into the back wall.

5×8 hall bath · tub-to-shower + tile · 4 weeks

See Broomfield bath
Northglenn
Bathroom floor under construction with a shower drain, waterproofing membrane, and unfinished walls.
Before
Completed bathroom with black-and-white checkerboard floor tile.
After

Northglenn primary bath, full gut

Full gut to the studs, layout reworked, freestanding tub in the alcove.

9×11 primary bath · full gut + layout · 6 weeks

See Northglenn primary bath
Arvada
Large-format shower wall tile in progress with leveling clips, spacers, and a recessed niche.
Before
Finished large-format tiled shower with a mosaic niche and completed shower pan.
After

Arvada shower, tile + waterproofing

Schluter Kerdi system beneath large-format wall tile, curb down to the subfloor.

42×60 shower pan · Kerdi + large-format tile · 2 weeks

See Arvada shower
Thornton
Interior wall opened to studs during a remodel with the flooring protected.
Before
White subway-tile backsplash installed across a kitchen wall with a level layout.
After

Thornton backsplash, full-height

Subway tile run from counter to upper cabinets, outlet cutouts clean.

22-sq-ft wall · full-height subway · 4 days

See Thornton backsplash
Federal Heights
Room with a bare subfloor prepared for flooring installation.
Before
Completed room with black-and-white herringbone tile flooring and finished transitions.
After

Federal Heights, LVP main floor

Luxury vinyl plank run through living and dining, subfloor leveled first.

640 sq ft · LVP + subfloor leveling · 1 week

See Federal Heights
Broomfield
Bare yard beside a red outbuilding before construction of a covered timber deck.
Before
Timber deck framing with joists and support hardware visible from below.
After

Broomfield deck, composite rebuild

Footings below frost depth, composite deck boards, code-compliant rail.

18×14 deck · composite rebuild · 3 weeks

See Broomfield deck

Working across Adams County

We work a tight radius around Thornton and the same crew does every job here.

Eight projects on this page came from the same kitchen-to-bath-to-tile sequence the homeowner who calls us next week is going to need. Same substrate standards. Same waterproofing system. Same scope-of-work language on the estimate. Read the offer first, then read the photos, then decide whether the crew behind them is the crew you want on your project.

Free in-home estimate

Ready when you are.

We come out, walk the project, and send a written quote — most within a few business days.